Purchasing process
Answer: Consultation, test, technical scheme determination, business negotiation, contract.
Answer: Consultation, test, technical scheme determination, business negotiation, contract.
Answer: Over 100 sets
Answer: 1 set.
Answer: It is the strength of R&D, the highness of technique, and the standardization of production that synthetically ensures steady [...]
Answer: Minjie engages in research, manufacturing and sales of advanced drying equipment (vacuum belt dryer & thin-layer drying system), low [...]
Answer: Since 1998.